Pengukuran Waktu Kerja Karyawan Bengkel Hardchrome CV. Abad 21 Samarinda
DOI:
https://doi.org/10.53640/jemi.v2008i3.1065Keywords:
Measurement of working time.Abstract
The research objective was to determine the time of labor standards hardchrome coating at the CV. Abad 21 in Samarinda. Research carried out for 2 months at the CV. Abad 21 in Samarinda with the object of research is
limited regarding the calculation of working time for coating hardchrome workmanship. Data collected in the study include: an overview of hardchrome business, primary and secondary
observational data, and the amount of labor. Data collection techniques used were: (1) observation, (2) interview, (3) documentation, and (4) the study of literature, namely the collection of data from
reports or records owned by CV. Abad 21 in Samarinda. The results indicated that: (1) the average time hardchrome coating at the CV. Abad 21 in Samarinda
during 5 times of observation is 501 minutes or 8 hours 21 minutes (2) the normal time hardchrome
coating at the CV. Abad 21 in Samarinda is 501 minutes or 8 hours 21 minutes; and (3) coating
hardchrome standard time at the CV. Abad 21 in Samarinda by using the leeway factor of 15% of
normal time is 576 hours or 9 hours 36 minutes.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 Robin Jonathan
This work is licensed under a Creative Commons Attribution 4.0 International License.