Pengukuran Waktu Kerja Karyawan Bengkel Hardchrome Cv. Abad 21 Samarinda

Robin Jonathan

Abstract

The research objective was to determine the time of labor standards hardchrome coating at the CV. Abad 21 in Samarinda.

Research carried out for 2 months at the CV. Abad 21 in Samarinda with the object of research is limited regarding the calculation of working time for coating hardchrome workmanship.

Data collected in the study include: an overview of hardchrome business, primary and secondary observational data, and the amount of labor. Data collection techniques used were: (1) observation, (2) interview, (3) documentation, and (4) the study of literature, namely the collection of data from reports or records owned by CV. Abad 21 in Samarinda.

The results indicated that: (1) the average time hardchrome coating at the CV. Abad 21 in Samarinda during 5 times of observation is 501 minutes or 8 hours 21 minutes (2) the normal time hardchrome coating at the CV. Abad 21 in Samarinda is 501 minutes or 8 hours 21 minutes; and (3) coating hardchrome standard time at the CV. Abad 21 in Samarinda by using the leeway factor of 15% of normal time is 576 hours or 9 hours 36 minutes.


Key words: Measurement of working time

Full Text:

PDF


Refbacks

  • There are currently no refbacks.
Powered by OJS | Design by ThemeOJS